![]() |
CANSU ELEKTRİK ÜRETİM A.Ş.
Situated in the borough limits of Murgul in the City of Artvin -an Eastern Black Sea Region city which has borders with Georgia-, Cansu Hydroelectric Power Plant is a river-type power plant owned and operated by Cansu Elektrik Üretim A.Ş. Source water for that power plant is provided by Kabaca Stream, the main branch Murgul Creek that one of the side branches of Çoruh River.
Cansu HPP is awarded with a 49-year production license by Energy Market Regulatory Body based on its resolution no. EÜ/373-2 dated 12.10.2004.
Overall capacity of the regulator and the facilities that are constructed around the river mouth has been defined and designed as 5,00m3/hour.
With its 11,34 MW installed capacity, Cansu Hydroelectric Power Plant’s production capacity is 51.571 GWh/year.
|
![]() |
MERAL ELEKTRİK ÜRETİM A.Ş.
Situated in the borough limits of Tortum in the City of Erzurum –an Eastern Anatolian city-, Esendurak Hydroelectric Power Plant is a river-type power plant owned and operated by Meral Elektrik Üretim A.Ş. Source water for that power plant is provided by Alapınar Stream, a side branch of Tortum Creek that one of the side branches of Çoruh River.
Esendurak HPP is awarded with a “46-year 5-month 27-day” production license by Energy Market Regulatory Body based on its resolution no. EÜ/2132-6 dated 17.06.2009.
With its 9,52 MW installed capacity, Esendurak Hydroelectric Power Plant’s production capacity is 42.421 GWh/year.
|